尼日利亚AKK项目线路土建招标项目
2024年06月18日
招标公告
Announcement for Bids
To All Bi(略) From Tenderee BRENTEX CPP LIMITED
Tender Title: The Civil Works of Pipeline
Tender Number: ENK-PB-AKK-SUB-2024-0001
Dear Sirs,
Brentex CPP Limited (hereinafter referred to as “BRENTEXCPP” or “BLC”) is currently awarded the project EPCC OF 40” X 614KM AJAOKUTA TO KA(略)TO KANO (AKK) GAS PIPELINE PROJECT (SE(略) 2). The project Owner is Nigerian National Petroleum Corporation (hereinafter referred to as “NNPC”). Hereby, BRENTEXCPP is pleased to invite your company to submit a sealed Bid for The Civil Works of Pipeline.
En(略)En(略)FZE, the te(略)agent, hereby releases the Bidding Announcement, in(略)interested bi(略) to participate in the bidding.
Your Bid submission shall be strictly in accordance with the following attached Tendering documents:
Att(略) 1 Acknowledge and Confirmation Letter
Attachment 2 Technical Pr(略)
Attachment 3.1 General Preamble
Attachment 3.2 BOQ and Commercial Proposal
Attac(略)4 Drawings and Specification Do(略)
Attachment 5 BID EVALUATION CRITERIA
All costs incurred in preparing and sub(略)your Bid including presentations and site visits (if required) shall be solely at your own expense and will not be reimbur(略)by BRENT(略) under any circumstances.
Furthermore, BRENTEXCPP shall not be responsible for any loss and/or delay in delivering your proposals. BRENTEXCPP reserves the right to reject any or all Bidders or se(略) Bidder(s) of its choice without assigning any reason. Your electronic bids should be submitted to the following encrypt email addresses:
Technical proposal: (略)
Encrypted Commercial proposal: (略)
Password:(略)
Bids shall be submitted no later than the closing time 9:00 AM (Abu Dhabi Time), 28th June 2024. Late bids will be rejected.
Please acknowledge receipt by advising via formal email of your interest to offer your proposal within two (2) days upon receipt of this invitation. Please see the details in:
ATTACHMENT I ACKNOWLEDGMENT AND CONFIRMATION LETTER FORM
IMPORTANT NOTE:
1. Acknowledgment, clarifications, Technical and Commercial Proposal and other information about INIVITATION TO BID shall be sent to email address:
(略)
2. Electronic Bid in Attachment 2 3 te(略)and commercial proposal, the filled and signed or sealed TECHNICAL BID EVALUATION CRITERIA and COMM(略)EVA(略)CRITERIA in Attac(略)5 BID EVALUATION CRITERIA are strictly required to su(略) to the following encrypted email addresses:
Technical proposal:
(略)
Encrypted Commercial proposal:
(略)
Password:
(略)
(Those bids sent to other email ad(略) shall be rejected and deemed as invalid.)
3. Bidder shall read these instructions to bidders carefully and submit proposal in strict compliance with the instruction contained herein. Failure of which shall render bidder’s pr(略)disqualified from fu(略) consideration.
4. Acquisition of Tendering Documents
Time of receiving the tendering documents: 9:00 AM on 18 June 2024 to 5:00 PM on 25 June 2024 (Abu Dhabi time, the same below).
Those who intends to participate in the bidding, please contact Ms. Zhao Jin to obtain the tendering documents.
Contact person: (略)
Tel: (略)
E-mail: (略)
5. Bid Opening
Time: 9:00 AM (Abu Dhabi Time), 28th June 2024;
Place: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE
6. The media of the announcement
This tender announcement is issued on: https://(略)com/.
7. Contacts
Tenderee: (略)
Contact person:(略)
Tel:(略)
Tendering Agent: (略)
Address: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE
Contact person: (略)
Tel : (略)
E-mail: (略)
8. Main Scope of Work of the Tender
The Bi(略)shall furnish, without limitation, all facilities, tools, labor, supervision, technical and professional services, material, equipment, supplies and consumables including any other work required for the worked stated in BOQ, including Pipeline Trench Excavation, Pipeline Trench Pa(略) Backfilling in normal areas, minor Road Crossings etc., fabrication and installation of concrete slab and concrete collars. Details, please refer to the Attachment 3.2 BOQ.
9. Pipeline Const(略) Technical Requirements
The BIDDER shall perform all Works related to the preparation, execution and maintenance of the WORK, including, but not limited to:
a. Exact position determination of existing pipelines in parallel to the Pipeline;
b. Envir(略) and archaeological salvage operations;
c. Locating of services and installations;
d. Structures;
e. Unexplo(略)ordina(略)
f. Protection of tr(略)
h. Disposal of refuse and debris;
i. Temporary access roads to the ROW of KP399-KP502; and
j. Maintenance of the ROW.
The detailed provisions for the preparatory works and maintenance of the ROW are specified in document G791-ILF-AKPL-CO-SPC-0001 “Construction Specification - Pipeline” and other applicable Project Specifications.
10. Qualification documents including but not limited to:
The BIDDER shall provide Company License, Qualification Certification, List of Key Management and Team Personnel, Experience and Project References and Construction Execution Plan,etc. Refer to Attachment 2 Technical Pr(略) for detailed requirements.