尼日利亚AKK项目线路土建招标项目
全部类型全国2024年06月18日
招标公告
Anno(略) for Bids
To All Bi(略) From Tenderee BRENTEX CPP LIMITED
Tender Title: The Civil Works of Pipeline
Tender Number: ENK-PB-AKK-SUB-2024-0001
Dear Sirs,
Brentex CPP Limited (hereinafter referred to as “BRENTEXCPP” or “BLC”) is currently aw(略)the project EPCC OF 40” X 614KM AJ(略)TO KADUNA TO KANO (AKK) GAS PIPELINE PROJECT (SEGMENT 2). The project Owner is Nigerian National Petroleum Corporation (her(略)referred to as “NNPC”). Hereby, BRENTEXCPP is pl(略)to in(略)your company to su(略) a sealed Bid for The Civil Works of Pipeline.
Enlink Energy FZE, the tendering agent, hereby releases the Bidding Announcement, inviting interested bidders to part(略) in the bidding.
Your Bid submission shall be strictly in accordance with the following attached Tendering documents:
Attachment 1 Acknowledge and Confirmation Letter
Attachment 2 Technical Proposal
Attachm(略) 3.1 General Preamble
Attachment 3.2 BOQ and Commercial Proposal
Attachment 4 Drawings and Speci(略) Document
Attachment 5 BID EVALUATION CR(略)
All costs incurred in preparing and submitting your Bid including presentations and site vi(略)(if required) shall be solely at your own expense and will not be reimbur(略) by BRENTEXCPP under any circumstances.
Furthermore, BRENTEXCPP shall not be responsible for any loss and/or delay in deliv(略)your proposals. BRENTEXCPP re(略)the right to reject any or all Bidders or se(略)Bidder(s) of its choice without assigning any reason. Your electronic bids sh(略)be submitted to the following en(略) email addresses:
Technical proposal: (略)
Encrypted Commercial proposal: (略)
Password:(略)
Bids shall be submitted no later than the closing time 9:00 AM (Abu Dhabi Time), 28th June 2024. Late bids will be rejected.
Please acknowledge receipt by advising via formal email of your interest to offer your proposal within two (2) days upon receipt of this invitation. Please see the details in:
ATTACHMENT I ACKNOWLEDGMENT AND CONFIRM(略) LETTER FORM
IMPORTANT NOTE:
1. Acknowledgment, clarifications, Technical and Commercial Proposal and other information about INIVITATION TO BID shall be sent to email address:
(略)
2. Electronic Bid in Attachment 2 3 technical and commercial proposal, the filled and signed or se(略)TE(略)BID EVAL(略)CRITERIA and COMMERCIAL EVALUATION CRITERIA in Attachment 5 BID EVALUATION CRITERIA are strictly required to submit to the following encrypted email ad(略):
Technical proposal:
(略)
Encrypted Commercial proposal:
(略)
Password:
(略)
(Those bids sent to other email address shall be rejected and deemed as invalid.)
3. Bidder shall read these instructions to bidders carefully and submit proposal in strict compliance with the instruction contained herein. Fa(略)of which shall render bi(略) proposal disqualified from further consideration.
4. Acquisition of Tendering Documents
Time of receiving the tendering documents: 9:00 AM on 18 June 2024 to 5:00 PM on 25 June 2024 (Abu Dhabi time, the same below).
Those who in(略)to par(略) in the bidding, please contact Ms. Zhao Jin to obtain the tendering documents.
Contact person: (略)
Tel: (略)
E-mail: (略)
5. Bid Opening
Time: 9:00 AM (Abu Dhabi Time), 28th June 2024;
Place: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE
6. The media of the ann(略)
This tender announcement is issued on: https://(略)com/.
7. Contacts
Tenderee: (略)
Contact person:(略)
Tel:(略)
Tendering Agent: (略)
Address: 50th Floor, Addax Office Tower, Al Reem Island, Abu Dhabi, UAE
Contact person: (略)
Tel : (略)
E-mail: (略)
8. Main Scope of Work of the Tender
The Bidder shall furnish, without limitation, all facilities, tools, labor, supervision, technical and professional services, material, equipm(略)su(略)and consu(略)including any other work required for the worked st(略)in BOQ, including Pi(略)Trench Excavation, Pipeline Trench Padding Backfi(略)in normal areas, minor Road Crossings etc., fabrication and installation of concrete slab and concrete collars. Details, please refer to the Attach(略) 3.2 BOQ.
9. Pipeline Construction Technical Requirements
The BIDDER shall perform all Works related to the preparation, execution and maintenance of the WORK, including, but not limited to:
a. Exact position determination of existing pipelines in parallel to the Pipeline;
b. Env(略) and archaeological salvage operations;
c. Locating of services and instal(略)
d. Structures;
e. Unexploded ordinance;
f. Protection of trees;
h. Disposal of refuse and debris;
i. Temporary access roads to the ROW of KP399-KP502; and
j. Maintenance of the ROW.
The detailed provisions for the preparatory works and maintenance of the ROW are specified in document G791-ILF-AKPL-CO-SPC-0001 “Construction Specification - Pipeline” and other applicable Pr(略)Speci(略).
10. Qualification documents including but not limited to:
The BIDDER shall provide Company License, Qualification Certification, List of Key Managem(略)and Team Pers(略)Experience and Project References and Const(略)Execution Plan,etc. Refer to Attachment 2 Technical Proposal for detailed requi(略).